National Institute of Technology Calicut
- Construction of approach road for the Subway across Calicut-Mukkam road at NIT Calicut
- Providing aluminum partition and floor tile for new labs for ECED at ground floor and first floor of existing old Library Building
- Urgent maintenance work to heat engine lab including providing new GI trafford roof sheet and new PVC sheet ceiling in fluid mechanics lab
- Providing motorable pathway connecting mega hostel 1 to 100 numbers residential quarters
- Renovation of west wing of main building rooms in GF & FF including toilets
- Providing new work tables with ceramic laboratory sink for labs in second floor of School of Biotechnology (room no. 306) including drainage line
- Renovation of Guest House rooms (first floor), including attached bathrooms, at NITC 2023-24
- Providing gallery, false ceiling, interior decor finishing in seminar hall at Architecture Department
- Provision of covered walkway from MBH II Main gate to MBH II & interlocked walkway in front of food court
- Re-tarring of roads in the residential area of the campus from main gate to Children's Park near swimming pool and from central library to OHT near B type quarters
- Construction of compound wall from Director's Bungalow to Guest House and TBI
- Urgent Aluminum Partitioning of Room No. 110, New Cabin room outside 110, at Chemical Engineering Department
- Maintenance work and toilet renovation work to MBA Hostel first block
- Maintenance work and toilet renovation work to MBA Hostel second block
- Renovation of fourth floor of MBA Hostel first block for accommodating international students, including kitchen facilities
- Maintenance work and toilet renovation work of the MBA hostel front courtyard (curved portion)
- Urgent establishment of a new lab at room no. 301 of production block
- Providing New Soak Pit for D11(A&B), D8(A&B), D43 & D44 Staff Quarters (4 nos.) and welded mesh for D11(A&B) to prevent entry of pests
- Extension of Environmental Engineering Lab
- Urgent Renovation work of Leaked Toilets in CAD/CAM center at Mechanical Engineering Department
- Urgent maintenance work of Production Engineering lab including replacement of AC roof sheet by GI sheet and providing PVC ceiling
- Construction of sand bag bund over existing check dam in river near NITC Pump house 2023-24
- Providing a pipeline for kitchen waste to the newly constructed tank at Mega Boys Hostel - 2
- Providing facility arrangements for Satellite Research Centre
- Aluminum Partitioning and PVC Ceiling work for CIKS in Central Library
- Providing New Work Tables with Storage Shelves at its bottom in the Control System Lab in Electrical PG Block